The concrete is poured, skeet houses are almost complete, been to RR & Imperial Polk-will drop by Sumterville next week, the combo field is supposed to be dedicated Feb 27, should be up & running before
Went to the range today the trap house is a total screw up has to be redone--there is no pitch on the roof and there is a 12" overhang on a box structure that looks way to narrow,