After talking to the Construction Supt. of the HOF Building, he said all contact was with the Architech on the building hired by the ATA, or HOF Trustees.
This is a Standard Pole Building Design, you can get them at any Lowes Store and Home DEpot at the construction Counter, or Pole Building Contractor.
All this High Paid Architect did was contact a Pole Bulding Contractor and ask to look at building plans for Pole Buildings, then get a copy of the plans at Lowes or Home Depot.
There is nothing Special about the BUILDING THAT REQUIRED AN ARCHITECH, The trusses are standard design and length. Available from any truss mfgr.
You or I could have picked out several pole building designs, it is not a Metal Framed Building.
Even Metal Framed Buildings could have been selected.
In my personal opinion over $750,000 was wasted, $1.2 Million for a max $523,000 building to the highest bidder and that included Motel and meals for the out of state construction workers.
Here is where one of the many, many, MONEY PIT EXISTS for our association
It was a 3 letter Architech Company, I failed to write it down when the Construction Supt gave it to me, he was also in contact with Jim Bradford, there is still money left in Construction Co funds to complete the Landscaping. I guess Jim Bradford suggested a Chain Link Fence around the structure, where was the Architech on this Item?
Gary Bryant...........................Dr.longshot
This is a Standard Pole Building Design, you can get them at any Lowes Store and Home DEpot at the construction Counter, or Pole Building Contractor.
All this High Paid Architect did was contact a Pole Bulding Contractor and ask to look at building plans for Pole Buildings, then get a copy of the plans at Lowes or Home Depot.
There is nothing Special about the BUILDING THAT REQUIRED AN ARCHITECH, The trusses are standard design and length. Available from any truss mfgr.
You or I could have picked out several pole building designs, it is not a Metal Framed Building.
Even Metal Framed Buildings could have been selected.
In my personal opinion over $750,000 was wasted, $1.2 Million for a max $523,000 building to the highest bidder and that included Motel and meals for the out of state construction workers.
Here is where one of the many, many, MONEY PIT EXISTS for our association
It was a 3 letter Architech Company, I failed to write it down when the Construction Supt gave it to me, he was also in contact with Jim Bradford, there is still money left in Construction Co funds to complete the Landscaping. I guess Jim Bradford suggested a Chain Link Fence around the structure, where was the Architech on this Item?
Gary Bryant...........................Dr.longshot