Mike with Ljutic said they are swamped Building new Guns and are in the design Phase of a new rib. And designing a New Ljutic.
The cost of cutting down my Picketts from Std at the rear to down as close as possible at the front of the Bbl has doubled, the time frame is 1 1/2 months to complete the job.
GB..................................DLS
The cost of cutting down my Picketts from Std at the rear to down as close as possible at the front of the Bbl has doubled, the time frame is 1 1/2 months to complete the job.