As of several weeks ago things looked good.. Totally under roof, windows in, door frames in. Insulation up, siding started. If I recall forms for the concrete in. With the good weather it may be ready for Karens Cup or the Buckeye ? Maybe Luke will enlighten us on the progress. Regards.....Gerald
Pictures would be nice if anyone lives close enough to get some. Heard a rumor that more drainage was added to some sites. Does anyone know this for a fact and if so which sites? I hope they added them to where we are. Our site is only about 50-70 feet from an existing sewage line. I would happily pay the extra for a full hook up. Our site has been our name going on four years. Ross Randall
All of the sites starting from the rest room on the east end behind bank 2 through four in the old vendor row have had sewage added as well as the sod removed and gravel put in for easy parking of each unit. Also from the end of the new vendor building going west clear to the end of the trap line behind bank 12 sewage and gravel parking has been added to every site.
seems they added a bunch of new camping spaces. All along the parking lot, facing the trap fields, they installed gravel spots with electric and water. Not sure if they have sewer. They start near the entrance and then again after the new building. I see they are also putting in something near the archery range. A complete area has been cleared. Not sure if it is camping or cabins. The place sure is growing.
If the "GOOD" folks at the Cardinal Center keep it up they will make some other shooting venues look like they are not trying ... Where Oh where does it all end ..? Please someone tell us they got weeds ..? WPT ... (YAC) ...
I think Luke and Jake are Turkey hunting right now so probably not paying much attention to the net. I was down there last month and place was busy in constitution like it seems to be every year, I've heard rumors of something coming but I'm sworn to secrecy. Maybe Merlo will scoop me but my source says he [she] is in the dark on this. Brad